Windsock Solar Farm is planned to be 200MW Solar and 100MW Battery Energy Storage Scheme.
More information can be found at the Windsock Solar Farm website.

Status

In Progress

Size

200MW

About the project

  • Windsock Solar Farm will comprise solar panels with a build-out size of around 200MW of solar power. The project will also include a Battery Energy Storage System (BESS) of around 100MW on the same site.
  • Approximately 366,000 solar panels will be sensitively spread across the site. They will sit around 3 metres off the ground, facing south at an angle of up to 20°.
  • The project will generate enough energy to power over 60,000 homes per year.  The development will supply power directly into the grid via an underground cable to a nearby proposed substation.
  • A community benefit package will be available for locals to spend according to their own priorities throughout the lifespan of the project.
  • As Windsock Solar Farm capacity exceeds 50MW, it is deemed ‘nationally significant’. A Development Consent Order will be required and approval from the Secretary of State for Energy Security and Net Zero.
  • Windsock Solar Farm is developed by BLC Energy and owned by TRIO Power Limited. TRIO is backed by the Octopus Renewable Infrastructure Trust (ORIT), a fund managed by Octopus Energy Generation (OEGEN). OEGEN is one of the largest renewable energy investors in Europe, managing more than 230 large-scale green energy projects with a combined capacity of 3.25 GW. 

Site layout

Pre-Planning

Community benefit

Windsock Solar Farm will generate an annual community benefit fund worth £500 for every megawatt (MW) of solar export capacity on site, equating to £100k per annum for 40 years, totalling at least £4 million over the lifetime of the project, index-linked. We would work closely with the Parish Council to establish how the community local to the project wish to manage this benefit fund.  BLC Energy and ORIT would like to split the benefit into 2 funds.  One to support local projects, one to be allocated to local households for a local energy discount scheme.


Public engagement

BLC Energy is committed to maintaining open communication channels with local communities, councils, and other stakeholders. This will be to discuss the project's development and the use of the community benefit fund.

  • The first public exhibition will take place on Friday 16 October 2026, 2pm - 6pm, and Saturday 17 October 2026, 10am -2pm, at Cranwell Village Hall, Cranwell.
    Download the Invitation
  • An online presentation will follow on Monday 19 October at 7 pm, giving anyone who could not attend in person the chance to ask questions. These events will introduce the proposed project, explain the environmental surveys being carried out, and gather feedback directly from the community.
    Register for the Online Presentation

  • The second public exhibition will take place in the same location, showing the results of the environmental surveys and the updated layout plans. An online presentation will follow in the evening after the second public exhibition.
  • If you have any further questions, please email us using the contact information below.

Project timeline

April 2025 – March 2026


Environmental studies on Ecology & birds started.

October 2026


First layout plan and 1st Public Exhibition on Friday 16 October 2026, 2pm - 6pm and on Saturday 17 October 2026, 10am - 2pm at Cranwell Village Hall.  Online presentation will follow on Monday 19 October at 7pm. 

February – April 2027


Final layout plan and 2nd Public Exhibition.

Mid to late 2027


Submission of DCO third quarter 2027.

2033 - 35


Construction start and expected grid connection date.



Project News

25 September 2026

Friday 16 October | 2:00pm - 6:00pmSaturday 17 October | 10:00am - 2:00pm Cranwell Village Hall, Old School Lane, Cranwell, NG34 8DF We would welcome your views at the exhibition. Our aim Read more...

5 August 2026

Below is a link to the slide deck for the project introduction and presentation to Cranwell, Brauncewell & Byard’s Leap Parish Council on 3/8/26. The agenda includes:Who We Are
Project Team
Location
The Read more...

Project Images

Exhibition Material

Application Documents

Available soon.

Media Enquiries

Please contact Sarah McDaid at McDaid Public Relations - 07866 789688 | sarah@mcdaidpr.co.uk

General Enquiries